Soil and Sediment hold times for O.Reg 153 and CCME

Modified on: Tue, 22 Jan, 2019 at 10:23 AM


                                                                                                                                                                                                                                                                                                                                                     

Test

Holding   Time

Containers

Notes

O.Reg. 153/04

CCME (2016)

O.Reg. 153/04

CCME (2016)

INORGANICS IN SOILS AND SEDIMENTS

Chloride,   Conductivity
30 days as received; Indefinite after lab drying
Glass,   HDPE or PET
Glass   jar, Teflon lined lid, HDPE, PET, PP
No   field preservation required. PET bags accepted under both regulations.
Cyanide (CN-)
14 days
Glass   jar, Teflon lined lid
Glass   jar, Teflon lined lid, HDPE
Protect   from light.
Fraction Organic Carbon (FOC)
28 days as received; indefinite after lab drying
Glass   jar, Teflon lined lid
Glass   jar, Teflon lined lid, HDPE, PET, PP
No   field preservation required.
Hexavalent Chromium
30 days as received
30   days as received; 7 days to analyze extract
Glass   jar, HDPE
Glass   jar, Teflon lined lid, HDPE
No   field preservation required.
Metals, SAR, HWS Boron
180 days as received; indefinite after lab drying
Glass   jar, HDPE
Glass   jar, Teflon lined lid, HDPE
No   field preservation required.
Mercury, Methyl mercury
28 days
Glass,   HDPE or PET
Glass   jar, Teflon lined lid, HDPE
No   field preservation required.
pH
30 days as received
30   days as received; Indefinite after lab drying
Glass,   HDPE or PET
Glass   jar, Teflon lined lid, HDPE, PET, PP
No   field preservation required. PET bags accepted under both regulations.
Particle Size
-
30 days as received; Indefinite after lab drying
-
Glass   jar, Teflon lined lid, HDPE, PET, PP
No   field preservation required.
Elemental Sulphur
-
30   days as received; 7 days to analyze extract
-
Glass   jar, Teflon lined lid, HDPE
No   field preservation required.

ORGANICS IN SOILS AND SEDIMENTS

BTEX,   PHCs (F1), THMs and VOCs
14 days for field preserved samples;   the methanol extracts are stable for 40 days; 48   hours for hermetic devices
40   days methanol extract; 14 days for NaHSO4 extract; 48 hours for hermetic devices
40-60mL   Methanol vial (pre-weighed) + glass jar for MC; hermetic   samplers are an acceptable alternative
40-60mL   Methanol vial (pre-weighed) + glass jar for MC; hermetic   samplers are an acceptable alternative; the use of NaHSO4 is an acceptable   alternative for low-level VOCs
NaHSO4   suitable alternative under CCME for low level VOCs; suitable alternative   under O.Reg.153 only for bromomethane.
1,4-Dioxane
May   be sampled / analyzed as a VOC or ABN
If   analyzed as a VOC, methanol or NaHSO4 are suitable preservatives; if analyzed   as an ABN, no preservation required.
PHCs F2-F4
14   days
14 days to extract; 40 days to analyze extract
Glass   jar, Teflon lined lid
Glass   jar, Teflon lined lid
No   field preservation is required.
ABNs, CPs, OCs, PAHs, Pesticides &   Herbicides
60   days
14   days to extract; 40 days to analyze extract
Glass   jar, Teflon lined lid
Glass   jar, Teflon lined lid
No   field preservation is required.
Dioxins & Furans, PCBs
Indefinite storage time
Glass   jar, Teflon lined lid
Glass   jar, Teflon lined lid
No   field preservation is required.
PFASs
-
14   days to extract; 40 days to analyze extract
-
Glass   jar, PE lined lid
No   Teflon materials should be used; no field preservation is required.
Glycols
-
14   days to extract; 40 days to analyze extract
-
Glass   jar, Teflon lined lid
No   field preservation is required.
Legend:
 
 
 
 
HDPE - high density polyethylene
 



PET - polyethylene terephthalate
 



PP - polypropylene
 



H/LD PE - high / low density polyethylene
 





Did you find it helpful? Yes No

Send feedback
Sorry we couldn't be helpful. Help us improve this article with your feedback.

ENVIRONMENTAL